Project in Los Angeles California

Industrial facility located in Los Angeles, California. Primary constituent of concern was freon 113. Initial concentrations were approximately 8,500 PPMV with a 100 SCFM system achieving approximately 10,000 pounds of removal. Once VOC concentrations were effectively reduced to 500 PPMV, the C3-VES system was replaced with a blower equipped with GAC vessels for carbon adsorption

 

In-Situ Thermal Resistance Heating Project in Midwest

Industrial facility required rapid cleanup using in-situ thermal resistance heating. G.E.O. C3 technology was utilized for the off-gas treatment during heating and degassing of the subsurface soils. Primary constituent of concern was tetrachloroethylene (PCE). 200 SCFM system used during short duration pilot test.